Yes. Typically there is a deposit for equipment procurement, followed by stage payments (installation, commissioning, handover). The exact schedule is set out in the contract.

Regular clients and large projects can have individual terms.

Practical tips

  • Fix the payment schedule and scope of each stage in the contract.
  • Sign an acceptance certificate for each stage before the next payment.
  • Check whether equipment prices are fixed once the deposit is paid.